中文
  • Home
  • About us
    Members Organization Structure Leadership CPICU Introduction
  • NewsRoom
    Industry news CPICU news
  • Business Scope
    Business Scope
  • Achievements
    Hydropower Infrastructure Distribution/Grids Nuclear Power New Energy Thermal Power Equipment Manufacturing Others
  • Contact us

Achievements

  • Hydropower
  • Thermal Power
  • New Energy
  • Nuclear Power
  • Distribution/Grids
  • Infrastructure
  • Equipment Manufacturing
  • Others

Distribution/Grids

  • Nuclear Power Transmission (EPC)Project in Belarus
  • 220kV GuoHe Switch Station Project in Inner Mongolia
  • The GDHA 500kV Power Transmission and Transformation Project in Ethiopia
  • The ±800kV Belo Monte UHV DC Transmission(Phase I and II)Project in Brazil
  • Al-Zulfi 380/132/33kV Substation Project in Saudi Arabia
  • Transmission line Business in Brazil
  • Datka–Kemnh 500kV Electric Transmission Line and Substation Project in Kyrgyzstan
  • The 500kV & 230kV Power Transmission and Transformation Line and Substation Project in Ecuador
  • Sarawak 500 kV Transmission Line(EPC)Project (Package B) in Malaysia
  • Phnom Penh - Battambang 230kV Power Transmission Line Project in Combodia
 Total 10 result 1

Copyright CPICU All Rights Reserved. 京ICP备17045296号-2

No.1 Lane 2, Baiguang Road, Xicheng District, Beijing, 100761 China

E-mail: cpicu@cec.org.cn