The Nuclear Electric Power Output Project in Belarus is mainly about the construction and renovation of power transmission system of nuclear station in Belarus which crossing Grodno, Vitebsk and Minsk. The works of the project include the construction and fiber optic cable replacement of single circuit transmission line of 330kV, 10kV and 35kV, the construction of a substation of 330kV and the extension of 4 substations of 330kV. Specifically, the new construction of 20 single circuit transmission lines with 330kW reaches a length of 1039.01 KM. As the project EPC contractor, Energy China's CPECC North China Power Engineering Co., Ltd successfully applied the Concessional Buyer's Credit from Exim Bank of China for the project financing. The project EPC contract, with a total contract amount of USD 400 millions, was commenced on December 8, 2014 and is expected to be completed on December 31, 2018. Currently, the project is in sound performance and progress well in conformity with the contract requirements.