Achievements

Shahjibazar Combined Cycle Power Plant Project in Bangladesh

        Shahjibazar Combined Cycle Power Plant located in northeastern Bangladesh, 140Km away from capital Dacca and 20Km adjacent to Indian border, is equipped with 9E gas turbine (2 plus 1 with net output of 330MW) and was executed by Guangdong Electric Power Design Institute Co., Ltd. and Guangdong Power Engineering Co., Ltd. combined as the EPC consortium. The project was supported by Chinese export buyer’s credit and is going to be completed soon.